Wongm's Rail Gallery » Furlong Main level crossing removal project

Constructing a pump station to extract stormwater from the railway cutting at St Albans station

In album: Furlong Main level crossing removal project

Constructing a pump station to extract stormwater from the railway cutting at St Albans station

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 29 September 2016 07:39 AM
Exposure Time: 1/320 sec
Aperture Value: f/5.6
Viewed 613 times
(1 time this week, 3 times this month, 78 times this year)