Wongm's Rail Gallery » Furlong Main level crossing removal project

Temporary fixings hold up the overhead while it is being installed

In album: Furlong Main level crossing removal project

Temporary fixings hold up the overhead while it is being installed

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 27 October 2016 13:32 PM
Exposure Time: 1/640 sec
Aperture Value: f/13
Viewed 481 times
(2 times this week, 5 times this month, 28 times this year)