Wongm's Rail Gallery » Furlong Main level crossing removal project

Fresh copper overhead wiring at St Albans

In album: Furlong Main level crossing removal project

Fresh copper overhead wiring at St Albans

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 1 November 2016 15:51 PM
Exposure Time: 1/1000 sec
Aperture Value: f/10
Viewed 367 times
(1 time this week, 1 time this month, 43 times this year)