Wongm's Rail Gallery » Furlong Main level crossing removal project

Fresh copper overhead wiring at St Albans

In album: Furlong Main level crossing removal project

Fresh copper overhead wiring at St Albans

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 1 November 2016 15:51 PM
Exposure Time: 1/1000 sec
Aperture Value: f/9
Viewed 451 times
(1 time this week, 6 times this month, 29 times this year)