Wongm's Rail Gallery » Furlong Main level crossing removal project

Pile of scrapped steel signal cable trunking at Ginifer

In album: Furlong Main level crossing removal project

Pile of scrapped steel signal cable trunking at Ginifer

View full sized (1024px by 683px)

Taken with a Canon EOS 7D
Date: Friday 18 November 2016 08:18 AM
Exposure Time: 1/800 sec
Aperture Value: f/7.1
Viewed 526 times
(1 time this week, 2 times this month, 2 times this year)