Wongm's Rail Gallery » Furlong Main level crossing removal project

Extra soil nails added to the shotcreted cutting wall at St Albans

In album: Furlong Main level crossing removal project

Extra soil nails added to the shotcreted cutting wall at St Albans

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: Friday 18 November 2016 08:22 AM
Exposure Time: 1/320 sec
Aperture Value: f/9
Viewed 544 times
(1 time this week, 1 time this month, 1 time this year)