Wongm's Rail Gallery » Furlong Main level crossing removal project

Work stalled at the Ruth Street pedestrian bridge

In album: Furlong Main level crossing removal project

It was due to open to the public at the end of October
Work stalled at the Ruth Street pedestrian bridge

View full sized (1024px by 683px)

Taken with a Canon EOS 7D
Date: Tuesday 22 November 2016 09:55 AM
Exposure Time: 1/250 sec
Aperture Value: f/8
Viewed 499 times
(1 time this week, 1 time this month, 2 times this year)