Wongm's Rail Gallery » Furlong Main level crossing removal project

Tertiary bonding of the overhead lines at Ginifer station

In album: Furlong Main level crossing removal project

Due to the metal stanchions being tied electrically to the cutting walls, additional insulation is required between them and the overhead wires.
Tertiary bonding of the overhead lines at Ginifer station