Wongm's Rail Gallery » Furlong Main level crossing removal project

Transition between in-situ concrete and shotcreted soil nailed retaining walls at the southernmost end of the cutting at St Albans

In album: Furlong Main level crossing removal project

Transition between in-situ concrete and shotcreted soil nailed retaining walls at the southernmost end of the cutting at St Albans

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: Tuesday 6 December 2016 07:58 AM
Exposure Time: 1/2000 sec
Aperture Value: f/8
Viewed 787 times
(1 time this week, 1 time this month, 1 time this year)