Wongm's Rail Gallery » Furlong Main level crossing removal project

Transition between in-situ concrete and shotcreted soil nailed retaining walls at the up end of St Albans

In album: Furlong Main level crossing removal project

Transition between in-situ concrete and shotcreted soil nailed retaining walls at the up end of St Albans

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 6 December 2016 07:59 AM
Exposure Time: 1/2000 sec
Aperture Value: f/8
Viewed 657 times
(2 times this week, 6 times this month, 34 times this year)