Wongm's Rail Gallery » Furlong Main level crossing removal project

Section of in-situ concrete retaining wall between shotcreted soil nailed walls

In album: Furlong Main level crossing removal project

Section of in-situ concrete retaining wall between shotcreted soil nailed walls

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 6 December 2016 07:59 AM
Exposure Time: 1/200 sec
Aperture Value: f/7.1
Viewed 993 times
(3 times this week, 6 times this month, 64 times this year)