Wongm's Rail Gallery » Furlong Main level crossing removal project

Additional soil nailing in the cutting walls at the up end of St Albans, now covered with shotcrete

In album: Furlong Main level crossing removal project

Additional soil nailing in the cutting walls at the up end of St Albans, now covered with shotcrete

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 6 December 2016 07:59 AM
Exposure Time: 1/320 sec
Aperture Value: f/9
Viewed 579 times
(1 time this week, 3 times this month, 35 times this year)