Wongm's Rail Gallery » Furlong Main level crossing removal project

Diesel powered pump to move water into a drainage pit at the down end of the trench at St Albans

In album: Furlong Main level crossing removal project

Diesel powered pump to move water into a drainage pit at the down end of the trench at St Albans

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: Friday 16 December 2016 08:17 AM
Exposure Time: 1/800 sec
Aperture Value: f/14
Viewed 678 times
(1 time this week, 2 times this month, 2 times this year)