Wongm's Rail Gallery » Furlong Main level crossing removal project

Patched up shotscrete at the down end of Ginifer station

In album: Furlong Main level crossing removal project

Patched up shotscrete at the down end of Ginifer station

View full sized (1024px by 683px)

Taken with a Canon EOS 7D
Date: Monday 6 March 2017 08:33 AM
Exposure Time: 1/160 sec
Aperture Value: f/9
Viewed 536 times
(1 time this week, 2 times this month, 3 times this year)