Wongm's Rail Gallery » Furlong Main level crossing removal project

Work to install handrails along the northern footbridge at Ginifer station

In album: Furlong Main level crossing removal project

Work to install handrails along the northern footbridge at Ginifer station

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 8 March 2017 20:29 PM
Exposure Time: 1/40 sec
Aperture Value: f/4.5
Viewed 349 times
(1 time this week, 4 times this month, 97 times this year)