Wongm's Rail Gallery » Furlong Main level crossing removal project

Hi-rail trucks working on the cutting walls at Ginifer station during the week long occupation

In album: Furlong Main level crossing removal project

Hi-rail trucks working on the cutting walls at Ginifer station during the week long occupation

View full sized (1024px by 683px)

Taken with a Canon EOS 7D
Date: 8 March 2017 20:31 PM
Exposure Time: 1/40 sec
Aperture Value: f/4
Viewed 365 times
(1 time this week, 5 times this month, 113 times this year)
0 votes from 1 view