Wongm's Rail Gallery » Furlong Main level crossing removal project

Excavators at work installing drainage pits between the running lines north of St Albans

In album: Furlong Main level crossing removal project

Excavators at work installing drainage pits between the running lines north of St Albans

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 8 March 2017 20:39 PM
Exposure Time: 1/40 sec
Aperture Value: f/4
Viewed 306 times
(1 time this week, 5 times this month, 86 times this year)
1 vote from 1 view