Wongm's Rail Gallery » Furlong Main level crossing removal project

Work to install handrails at the Ruth Street footbridge

In album: Furlong Main level crossing removal project

Work to install handrails at the Ruth Street footbridge

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 8 March 2017 20:42 PM
Exposure Time: 1/80 sec
Aperture Value: f/5.6
Viewed 273 times
(2 times this week, 2 times this month, 76 times this year)