Wongm's Rail Gallery » Furlong Main level crossing removal project

Drainage pipes waiting to be installed in rail corridor north of St Albans

In album: Furlong Main level crossing removal project

Drainage pipes waiting to be installed in rail corridor north of St Albans

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 8 March 2017 20:50 PM
Exposure Time: 1/160 sec
Aperture Value: f/6.3
Viewed 314 times
(3 times this week, 3 times this month, 86 times this year)