Wongm's Rail Gallery » Furlong Main level crossing removal project

Overhead wires disarranged north of St Albans, to allow excavators access for drainage works

In album: Furlong Main level crossing removal project

Overhead wires disarranged north of St Albans, to allow excavators access for drainage works

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 8 March 2017 20:57 PM
Exposure Time: 1/80 sec
Aperture Value: f/5.6
Viewed 524 times
(1 time this week, 1 time this month, 67 times this year)
0 votes from 1 view