Wongm's Rail Gallery » Furlong Main level crossing removal project

Final pieces of drainage work north of the Ruth Street pedestrian bridge

Final pieces of drainage work north of the Ruth Street pedestrian bridge

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: March 13, 2017 13:29 PM
Exposure Time: 1/640 sec
Aperture Value: f/11
Viewed 33 times
(1 time this week, 3 times this month)