Wongm's Rail Gallery » Furlong Main level crossing removal project

Final pieces of drainage work north of the Ruth Street pedestrian bridge

In album: Furlong Main level crossing removal project

Final pieces of drainage work north of the Ruth Street pedestrian bridge

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: Monday 13 March 2017 13:29 PM
Exposure Time: 1/1000 sec
Aperture Value: f/9
Viewed 548 times
(1 time this week, 3 times this month, 1 time this year)