Wongm's Rail Gallery » Furlong Main level crossing removal project

Handrails and balustrades finally completed at the Ruth Street pedestrian bridge

In album: Furlong Main level crossing removal project

Handrails and balustrades finally completed at the Ruth Street pedestrian bridge

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: Monday 13 March 2017 13:29 PM
Exposure Time: 1/500 sec
Aperture Value: f/16
Viewed 983 times
(1 time this week, 6 times this month, 2 times this year)