Wongm's Rail Gallery » Furlong Main level crossing removal project

Furlong Main level crossing removal project

In 2014 work commenced on the grade separation of the Main Road level crossing at St Albans station, with the Ginifer Road level crossing at Ginifer station later being added to the project scope.

Scattered myki readers installed on the temporary St Albans platform 2

November 06, 2015 08:37 AM
Viewed 172 times
(3 times this month)

Completed piling work along the western side of the existing rail corridor

November 06, 2015 08:35 AM
Viewed 233 times
(6 times this month)

Looking down the 'temporary' St Albans platform 2

November 06, 2015 08:34 AM
Viewed 185 times
(2 times this month)

Steel brackets used to support the cantilevered 'temporary' St Albans platform 2

Bolted into the top of the soldier pile wall on the western side of rail corridor - this will allow the excavation of the new station platform beneath it

November 06, 2015 08:34 AM
Viewed 225 times
(8 times this month)

Surveying marker affixed to the outer edge of the running rails

Installed so that the location of the track can be monitored during the excavation works, to verify that the tracks are not sliding into the hole

October 16, 2015 10:16 AM
Viewed 250 times

Piling works commence at the down end of the removed platform 2

October 16, 2015 10:16 AM
Viewed 373 times
(3 times this month)

Former stabling sidings turned over into a site compound

October 16, 2015 10:14 AM
Viewed 248 times
(1 time this month)

Installing cages of steel reinforcement into bored holes

October 16, 2015 10:12 AM
Viewed 272 times
(1 time this month)

Piling works also starting at the up end of the platform

October 16, 2015 10:09 AM
Viewed 241 times
(1 time this month)

'All except St Albans' stopping pattern for a down Watergardens service

October 09, 2015 17:42 PM
Viewed 214 times
(5 times this month)

'Not stopping St Albans' stopping pattern for a down Sunbury service

October 09, 2015 17:29 PM
Viewed 251 times
(4 times this month)

Pebblecrete cladding panels stripped from the St Albans station building

October 08, 2015 18:49 PM
Viewed 270 times
(2 times this month)

Remains of a 'roundel' nameboard on the station building

October 08, 2015 18:49 PM
Viewed 234 times
(4 times this month)

Pebblecrete cladding panels stripped from the St Albans station building

October 08, 2015 18:44 PM
Viewed 249 times
(2 times this month)

Pebblecrete cladding panels stripped from the St Albans station building

October 08, 2015 18:39 PM
Viewed 227 times
(2 times this month)

Waiting shelters removed from platform 2 and 3

October 08, 2015 18:37 PM
Viewed 243 times
(5 times this month)

Temporary station building in place beside St Albans platform 1

October 04, 2015 09:30 AM
Viewed 436 times
(1 time this month)

Closed down booking office on St Albans platform 2 and 3

October 04, 2015 09:18 AM
Viewed 247 times

Stripped out waiting room at St Albans platform 2 and 3

October 04, 2015 09:18 AM
Viewed 285 times
(1 time this month)

Piling rig and mobile crane in place on the western side of the St Albans work site

October 04, 2015 09:16 AM
Viewed 301 times
(1 time this month)

St Albans platform 3 minus track and overhead

October 04, 2015 09:10 AM
Viewed 275 times
(1 time this month)

Modified PTV signage at St Albans station

October 04, 2015 09:08 AM
Viewed 320 times
(2 times this month)
Tags

Viewed 3459 times (67 times this month)