Wongm's Rail Gallery » Gap Road, Sunbury level crossing removal

Installing plastic wall tiles along the cutting walls

In album: Gap Road, Sunbury level crossing removal

Installing plastic wall tiles along the cutting walls

View full sized (1024px by 683px)

Taken with a Canon EOS 7D
Date: Saturday 17 September 2022 16:03 PM
Exposure Time: 1/250 sec
Aperture Value: f/6.3
Viewed 64 times
(1 time this week, 1 time this month, 26 times this year)