Wongm's Rail Gallery » Gap Road, Sunbury level crossing removal

Installing plastic wall tiles along the cutting walls

In album: Gap Road, Sunbury level crossing removal

Installing plastic wall tiles along the cutting walls

View full sized (1024px by 683px)

Taken with a Canon EOS 7D
Date: 17 September 2022 16:03 PM
Exposure Time: 1/250 sec
Aperture Value: f/6.3
Viewed 7 times
(7 times this week, 7 times this month, 7 times this year)