Wongm's Rail Gallery » Gap Road, Sunbury level crossing removal

Installing plastic wall tiles along the cutting walls

In album: Gap Road, Sunbury level crossing removal

Installing plastic wall tiles along the cutting walls

View full sized (1280px by 1920px)

Taken with a Canon EOS 7D
Date: 17 September 2022 16:04 PM
Exposure Time: 1/200 sec
Aperture Value: f/5.6
Viewed 4 times
(4 times this week, 4 times this month, 4 times this year)