Wongm's Rail Gallery » Sunbury Line Upgrade

Power and comms conduit waiting to be installed along the Sunbury line tracks at Footscray

In album: Sunbury Line Upgrade

Power and comms conduit waiting to be installed along the Sunbury line tracks at Footscray

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 16 August 2019 17:30 PM
Exposure Time: 1/100 sec
Aperture Value: f/5.6
Viewed 397 times
(1 time this week, 2 times this month, 30 times this year)