Wongm's Rail Gallery » Sunbury Line Upgrade

Applying the finishing touches to the new signal control centre at Sunshine

In album: Sunbury Line Upgrade

Applying the finishing touches to the new signal control centre at Sunshine

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 24 November 2020 12:58 PM
Exposure Time: 1/1000 sec
Aperture Value: f/10
Viewed 143 times
(1 time this week, 1 time this month, 3 times this year)