Wongm's Rail Gallery » Sunbury Line Upgrade

Installing conduit at Footscray between the Sunbury line and the new traction power substation

In album: Sunbury Line Upgrade

Installing conduit at Footscray between the Sunbury line and the new traction power substation

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: Wednesday 10 March 2021 15:46 PM
Exposure Time: 1/400 sec
Aperture Value: f/14
Viewed 183 times
(1 time this week, 1 time this month, 1 time this year)