Wongm's Rail Gallery » Sunbury Line Upgrade

Trench cut in the platform at Sunshine to run a grounding wire to a new overhead portal structure

In album: Sunbury Line Upgrade

Trench cut in the platform at Sunshine to run a grounding wire to a new overhead portal structure

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 27 March 2021 00:03 AM
Exposure Time: 1/80 sec
Aperture Value: f/6.3
Viewed 33 times
(1 time this week, 2 times this month, 33 times this year)