Wongm's Rail Gallery » Sunbury Line Upgrade

New cantilevered overhead structures in place between Albion and Ginifer

In album: Sunbury Line Upgrade

With a single pole to one side to hold an electrolysis connection
New cantilevered overhead structures in place between Albion and Ginifer

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 22 May 2021 09:34 AM
Exposure Time: 1/1000 sec
Aperture Value: f/9
Viewed 165 times
(1 time this week, 3 times this month, 28 times this year)