Wongm's Rail Gallery » Thompsons Road level crossing removal project

Bridge for the eastbound carriageway now in use, carrying both directions of traffic until the second bridge is completed

In album: Thompsons Road level crossing removal project

Bridge for the eastbound carriageway now in use, carrying both directions of traffic until the second bridge is completed

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: Saturday 14 July 2018 11:46 AM
Exposure Time: 1/800 sec
Aperture Value: f/13
Viewed 509 times
(1 time this week, 1 time this month, 22 times this year)
0 votes from 1 view