Wongm's Rail Gallery » Track, rail and sleepers

Track, rail and sleepers

Track, rail and sleepers from Melbourne and the rest of Victoria

Concrete sleepers with the ends chopped off to fit around a drainage pit at North Melbourne

8 November 2019 08:41 AM
Viewed 77 times
(3 times this week, 12 times this month, 77 times this year)

'K' crossing at Richmond Junction

24 October 2019 10:24 AM
Viewed 89 times
(1 time this week, 3 times this month, 89 times this year)

'V' crossing at Richmond Junction

24 October 2019 10:24 AM
Viewed 105 times
(1 time this week, 4 times this month, 105 times this year)

Point motor fitted to points 640D at Flinders Street Station

17 October 2019 10:15 AM
Viewed 125 times
(2 times this week, 10 times this month, 125 times this year)

Transition between Duratrack composite plastic sleepers and concrete in the Punt Road bridge deck at Richmond platform 2

15 July 2019 13:29 PM
Viewed 212 times
(2 times this week, 11 times this month, 212 times this year)

Transition between Duratrack composite plastic sleepers and concrete in the Punt Road bridge deck at Richmond platform 2

15 July 2019 13:29 PM
Viewed 269 times
(7 times this week, 29 times this month, 269 times this year)

'VIC' cast into a broad gauge concrete sleeper on the RRL tracks at Sunshine

14 July 2019 11:18 AM
Viewed 127 times
(1 time this week, 6 times this month, 127 times this year)

Discarded insulated rail joints broken into the constituent pieces

13 May 2019 11:30 AM
Viewed 109 times
(3 times this week, 11 times this month, 20 times this year)

Rails from 1957 in the Geelong Grain Loop

1 May 2019 14:31 PM
Viewed 147 times
(3 times this week, 4 times this month, 25 times this year)

'Solacoat' paint applied to a short length of rails along the Racecourse line at Newmarket

20 January 2019 14:43 PM
Viewed 156 times
(2 times this month, 51 times this year)

'Duobloc' concrete sleepers in the down track between Jolimont and the West Richmond tunnel

Installed as a prototype for the City Loop

20 January 2019 13:45 PM
Viewed 289 times
(1 time this week, 5 times this month, 75 times this year)

Broken concrete sleeper beside the tracks at Macleod

20 January 2019 13:02 PM
Viewed 181 times
(1 time this week, 3 times this month, 67 times this year)

Rails directly fixed to the bridge deck at Langridge Street, North Richmond

20 January 2019 09:41 AM
Viewed 319 times
(2 times this week, 6 times this month, 126 times this year)

Coach bolts used to fix rail to timber sleepers at Clifton Hill

28 December 2018 11:34 AM
Viewed 241 times
(3 times this week, 1 time this month, 73 times this year)

Fresh lengths of rail between the running lines at Clifton Hill

21 November 2018 11:27 AM
Viewed 184 times
(3 times this month, 75 times this year)

'V' at the start of the check rail at Footscray platform 3

28 October 2018 09:03 AM
Viewed 459 times
(1 time this week, 26 times this month, 234 times this year)

LED signals and pneumatic point motors in the suburban train stabling sidings at Melbourne Yard

25 September 2018 08:51 AM
Viewed 276 times
(3 times this week, 153 times this year)

Rails fixed directly to the concrete deck of the Cremorne Bridge

Work done in the 1990s to increases the clearance on the Monash Freeway that passes under the bridge

26 August 2018 12:29 PM
Viewed 318 times
(5 times this week, 15 times this month, 161 times this year)

'Rocol SPS point lubrication trial' notice at North Melbourne Junction

17 April 2018 08:45 AM
Viewed 308 times
(3 times this month, 27 times this year)

AN / CCG branded concrete sleepers at Oakleigh

13 March 2018 13:23 PM
Viewed 290 times
(4 times this month, 35 times this year)

Boot prints in the dust on concrete sleepers

23 February 2018 18:02 PM
Viewed 305 times
(2 times this week, 11 times this month, 50 times this year)

Rusted over rails on the little used crossover tracks at North Melbourne Junction

4 December 2017 17:55 PM
Viewed 326 times
(6 times this month, 69 times this year)

AS 107LB (1964) AIS XI/1973 rail

12 April 2017 16:45 PM
Viewed 434 times
(5 times this week, 4 times this month, 59 times this year)

Fresh rail installed in the down track at Rushall

27 November 2016 13:09 PM
Viewed 423 times
(4 times this week, 9 times this month, 47 times this year)

Viewed 5952 times (22 times this week, 88 times this month, 373 times this year)