Wongm's Rail Gallery » Bendigo line resleepering

Telehandler and a stockpile of materials beside the line at Carlsruhe ready for another night of sleeper replacement

In album: Bendigo line resleepering

Telehandler and a stockpile of materials beside the line at Carlsruhe ready for another night of sleeper replacement

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 17 September 2022 14:24 PM
Exposure Time: 1/400 sec
Aperture Value: f/13
Viewed 20 times
(2 times this week, 2 times this month, 20 times this year)