Wongm's Rail Gallery » Bendigo line resleepering

Excavators and a stockpile of materials beside the line at Carlsruhe ready for another night of sleeper replacement

In album: Bendigo line resleepering

Excavators and a stockpile of materials beside the line at Carlsruhe ready for another night of sleeper replacement

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 17 September 2022 14:25 PM
Exposure Time: 1/400 sec
Aperture Value: f/11
Viewed 48 times
(1 time this week, 1 time this month, 48 times this year)