V/Line corridor mapping project

In August 2019 V/Line locomotive P12 was fitted with GPS, LIDAR and 360 degree camera equipment and sent all over Victoria to collect data about the rail network. In April 2020 a second survey was undertaken by locomotive P15, with ground penetrating radar equipment supplied by Zetica Rail used to measure trackbed condition, including ballast depth, fouling and roughness.

Zetica Rail ground penetrating radar equipment fitted to the end of P15

Used to measure trackbed condition, including ballast depth, fouling and roughness

23 April 2020 19:36 PM
Viewed 89 times
(1 time this week, 2 times this month, 89 times this year)

P12 and P15 pass through Sunshine on an inspection run from Warrnambool

23 April 2020 19:36 PM
Viewed 57 times
(1 time this week, 1 time this month, 57 times this year)

P12 departs Southern Cross on an inspection run to Lara via Werribee

12 August 2019 11:55 AM
Viewed 126 times
(2 times this week, 6 times this month, 126 times this year)

P12 departs Southern Cross on an inspection run to Lara via Werribee

12 August 2019 11:55 AM
Viewed 138 times
(3 times this week, 5 times this month, 138 times this year)

P12 between VLocity VL47 and VL13 at Southern Cross

12 August 2019 11:50 AM
Viewed 120 times
(1 time this week, 7 times this month, 120 times this year)

LIDAR, NovAtel GPS receiver, and 360 degree camera equipment mounted to the front of P12

12 August 2019 11:43 AM
Viewed 186 times
(1 time this week, 5 times this month, 186 times this year)

P12 arrives at Southern Cross from South Dynon, having travelled via South Kensington

12 August 2019 11:43 AM
Viewed 112 times
(2 times this week, 5 times this month, 112 times this year)

P12 shunts out of Southern Cross following the surveying run

9 August 2019 15:12 PM
Viewed 139 times
(2 times this week, 5 times this month, 139 times this year)

LIDAR, NovAtel GPS receiver, and 360 degree camera equipment mounted to the front of P12

9 August 2019 15:12 PM
Viewed 133 times
(1 time this week, 10 times this month, 133 times this year)

LIDAR, NovAtel GPS receiver, and 360 degree camera equipment mounted to the front of P12

9 August 2019 15:12 PM
Viewed 188 times
(1 time this week, 7 times this month, 188 times this year)

P12 on arrival at Southern Cross Station

Equipment bracket mounted on this end of the locomotive as well, but nothing fitted

9 August 2019 15:12 PM
Viewed 152 times
(1 time this week, 7 times this month, 152 times this year)

P12 crosses the North Melbourne flyover after a surveying run to Swan Hill and Echuca

Note the camera, LIDAR and GPS equipment bolted to the front of the engine

9 August 2019 15:05 PM
Viewed 141 times
(1 time this week, 4 times this month, 141 times this year)
Tags

Viewed 643 times (2 times this week, 18 times this month, 643 times this year)