Wongm's Rail Gallery » V/Line corridor mapping project

Zetica Rail ground penetrating radar equipment fitted to the end of P15

In album: V/Line corridor mapping project

Used to measure trackbed condition, including ballast depth, fouling and roughness
Zetica Rail ground penetrating radar equipment fitted to the end of P15

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 23 April 2020 19:36 PM
Exposure Time: 1/100 sec
Aperture Value: f/4
Viewed 301 times
(18 times this week, 23 times this month, 105 times this year)