Wongm's Rail Gallery » V/Line corridor mapping project

Zetica Rail ground penetrating radar equipment fitted to the end of P15

In album: V/Line corridor mapping project

Used to measure trackbed condition, including ballast depth, fouling and roughness
Zetica Rail ground penetrating radar equipment fitted to the end of P15

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: Thursday 23 April 2020 19:36 PM
Exposure Time: 1/100 sec
Aperture Value: f/4
Viewed 697 times
(1 time this week, 1 time this month, 145 times this year)