Wongm's Rail Gallery » V/Line trackwork and maintenance

V/Line trackwork and maintenance

Trackwork on the V/Line network that stretches across Victoria

Hi-rail excavator loads a hi-rail dump truck with fresh ballast from a works train

19 October 2019 22:46 PM
Viewed 126 times
(1 time this week, 10 times this month, 126 times this year)

Hi-rail excavator loads a hi-rail dump truck with fresh ballast from a works train

19 October 2019 22:45 PM
Viewed 124 times
(7 times this month, 124 times this year)

P18 at the other end of a push-pull spoil train at Southern Cross platform 3

19 October 2019 22:41 PM
Viewed 80 times
(6 times this month, 80 times this year)

Excavator loads sleepers and spoil into a dump truck at Southern Cross Station

19 October 2019 22:40 PM
Viewed 76 times
(2 times this week, 5 times this month, 76 times this year)

Laying down geotextile fabric and ballast on the track bed at the north end of Southern Cross platform 4

19 October 2019 22:39 PM
Viewed 58 times
(1 time this month, 58 times this year)

Excavator loads sleepers and spoil into a dump truck at Southern Cross Station

19 October 2019 22:39 PM
Viewed 93 times
(4 times this week, 9 times this month, 93 times this year)

Laying down geotextile fabric and ballast on the track bed at the north end of Southern Cross platform 4

19 October 2019 22:38 PM
Viewed 73 times
(3 times this month, 73 times this year)

Excavator loads sleepers and spoil into a dump truck at Southern Cross Station

19 October 2019 22:37 PM
Viewed 64 times
(1 time this week, 3 times this month, 64 times this year)

Excavator loads a spoil train at Southern Cross Station

19 October 2019 22:37 PM
Viewed 55 times
(1 time this week, 2 times this month, 55 times this year)

Excavator clears out the track bed at the north end of Southern Cross platform 4

19 October 2019 22:36 PM
Viewed 58 times
(3 times this month, 58 times this year)

Train loaded with ballast, rail, sleepers and everything else needed to replace two double compounds in the yard at Southern Cross Station

19 October 2019 22:34 PM
Viewed 77 times
(1 time this week, 2 times this month, 77 times this year)

'This area unavailable due to scheduled works' sign at Southern Cross Station

19 October 2019 22:29 PM
Viewed 78 times
(3 times this month, 78 times this year)

T385 stabled on a works trains at Southern Cross platform 4

Loaded with ballast, rail, sleepers and everything else needed to replace two double compounds in the yard at Southern Cross Station

19 October 2019 22:27 PM
Viewed 68 times
(2 times this month, 68 times this year)

Remove dual control point motors loaded into crates for removal

19 October 2019 22:14 PM
Viewed 72 times
(2 times this month, 72 times this year)

T385 stabled on a works trains at Southern Cross platform 4

Loaded with ballast, rail, sleepers and everything else needed to replace two double compounds in the yard at Southern Cross Station

19 October 2019 22:14 PM
Viewed 72 times
(2 times this month, 72 times this year)

V/Line incident response Toyota HiLux

19 October 2019 22:12 PM
Viewed 77 times
(3 times this week, 6 times this month, 77 times this year)

Excavator at Southern Cross loading a push-pull spoil train led by P17

19 October 2019 22:08 PM
Viewed 76 times
(1 time this week, 5 times this month, 76 times this year)

Sleepers, rail, and conduit loaded on a Southern Cross Station works train at Tottenham Yard

Everything needed to replace two double compounds in the yard at Southern Cross Station

16 October 2019 11:50 AM
Viewed 60 times
(2 times this week, 5 times this month, 60 times this year)

Sleepers, rail, fencing and barriers loaded onto a Southern Cross Station works train at Tottenham Yard

Everything needed to replace two double compounds in the yard at Southern Cross Station

16 October 2019 11:50 AM
Viewed 51 times
(2 times this week, 3 times this month, 51 times this year)

T385 trails T381 at Albion on a push pull works train from Somerton to Tottenham Yard

Loaded with ballast, rail, sleepers and everything else needed to replace two double compounds in the yard at Southern Cross Station

16 October 2019 10:59 AM
Viewed 62 times
(1 time this week, 2 times this month, 62 times this year)

T385 leads T381 at Albion on a push pull works train from Somerton to Tottenham Yard

Loaded with ballast, rail, sleepers and everything else needed to replace two double compounds in the yard at Southern Cross Station

16 October 2019 10:59 AM
Viewed 62 times
(1 time this week, 3 times this month, 62 times this year)

V/Line track gang ute at Murtoa

4 October 2019 14:37 PM
Viewed 97 times
(3 times this week, 11 times this month, 97 times this year)

Laing O'Rourke ballast tamper and regulator stabled at North Dynon

3 August 2019 09:12 AM
Viewed 90 times
(2 times this week, 90 times this year)

V/Line staff wrap up their repairs to a track fault on the RRL tracks at South Kensington

It resulted in V/Line trains running via the suburban tracks

6 May 2019 10:11 AM
Viewed 81 times
(1 time this week, 10 times this month, 17 times this year)
Tags

Viewed 14044 times (13 times this week, 54 times this month, 259 times this year)