Wongm's Rail Gallery » Pacific National Warrnambool freight

Pacific National Warrnambool freight

The Warrnambool freight carries containers between Melbourne and the Westvic depot in Warrnambool, usually running Monday through Friday. Operated by Pacific National, except for a period between April and October 2008 when El Zorro took over the contract. The train length is constrained by short crossing loops and often runs during the day on the down trip due to pathing issues beyond Geelong

G522 stabled at Swanston Dock East with the down Warrnambool freight

13 January 2019 15:10 PM
Viewed 54 times
(3 times this week, 8 times this month, 54 times this year)

Reach stacker unloads containers from the train

17 May 2017 14:45 PM
Viewed 253 times
(3 times this week, 7 times this month, 15 times this year)

Reach stacker unloads containers from the train

17 May 2017 14:45 PM
Viewed 557 times
(2 times this week, 5 times this month, 16 times this year)

Train crew place the derail block back over the rail at the entrance to the siding

17 May 2017 14:44 PM
Viewed 261 times
(1 time this week, 2 times this month, 9 times this year)

Reach stacker unloads containers from the train

17 May 2017 14:43 PM
Viewed 240 times
(1 time this week, 3 times this month, 6 times this year)

Reach stacker unloads containers from the train

17 May 2017 14:43 PM
Viewed 243 times
(4 times this week, 8 times this month, 13 times this year)

With the front half of the train stabled in the loop siding, G527 brings the rear half onto the other track

17 May 2017 14:39 PM
Viewed 231 times
(3 times this week, 4 times this month, 8 times this year)

With the front half of the train stabled in the loop siding, G527 brings the rear half onto the other track

17 May 2017 14:37 PM
Viewed 243 times
(3 times this week, 5 times this month, 9 times this year)

G527 top and tails two rakes of container wagons in the terminal at Westvic

All part of the convoluted runaround process for a long train in a short loop siding

17 May 2017 14:36 PM
Viewed 330 times
(4 times this week, 8 times this month, 13 times this year)

G527 brings half of the train back into the container terminal, ready to push the rear half out

17 May 2017 14:32 PM
Viewed 223 times
(3 times this week, 6 times this month, 11 times this year)

Rear half of the train sitting in the loop siding, already partially unloaded

17 May 2017 14:32 PM
Viewed 229 times
(2 times this week, 4 times this month, 10 times this year)

G527 ready to bring the front half of the train back into the Westvic container terminal

17 May 2017 14:32 PM
Viewed 266 times
(3 times this week, 4 times this month, 8 times this year)

G527 shunting the front half of the train out over the Walsh Road level crossing

17 May 2017 14:31 PM
Viewed 195 times
(3 times this week, 6 times this month, 11 times this year)

Shunting half of the train out over the Walsh Road level crossing

17 May 2017 14:30 PM
Viewed 274 times
(4 times this week, 5 times this month, 7 times this year)

G527 at the down end of the Westvic container terminal

Once the mainline that continued as far as Port Fairy

17 May 2017 14:26 PM
Viewed 251 times
(3 times this week, 6 times this month, 6 times this year)

G527 at the down end of the Westvic container terminal

17 May 2017 14:26 PM
Viewed 251 times
(3 times this week, 5 times this month, 9 times this year)

Train arrives complete at the Westvic container terminal

17 May 2017 14:23 PM
Viewed 312 times
(1 time this week, 7 times this month, 12 times this year)

Down train about to pass under McMeekin Road in Warrnambool

17 May 2017 14:18 PM
Viewed 216 times
(2 times this week, 4 times this month, 7 times this year)

G527 leads the train out of Warrnambool station bound for the Westvic container terminal

17 May 2017 14:16 PM
Viewed 235 times
(1 time this month, 3 times this year)

Crossing an unprotected level crossing at Cudgee

17 May 2017 13:54 PM
Viewed 218 times
(2 times this month, 8 times this year)

G527 leads the train over Brucknell Creek at Cudgee

17 May 2017 13:54 PM
Viewed 216 times
(2 times this month, 4 times this year)

G527 leads the train over Brucknell Creek at Cudgee

17 May 2017 13:54 PM
Viewed 188 times
(3 times this month, 5 times this year)

G527 leads the train over Yaloak Creek at Garvoc

17 May 2017 13:41 PM
Viewed 208 times
(1 time this month, 4 times this year)

G527 leads the train over Yaloak Creek at Garvoc

17 May 2017 13:41 PM
Viewed 219 times
(1 time this week, 3 times this month, 7 times this year)
Tags

Viewed 6041 times (10 times this week, 24 times this month, 242 times this year)